- Metal Finish Line : Roller Bed
- Body Transfer Line : EMS with Hoist Hanger
- Side & Roof Transfer Line : EMS with Hoist
TAN-CHONG Motor
1.5 mil $
Mar.2006 ~ Oct. 2006
Assembly Shop Volume Up
(CHINA)
- Production Capacity : 68 UPH
- T21 Line : P & F Chain Conveyor
Final 2 & 3 Line : Platform with Table Lifter /
4 Post Drop Lifter (Belt)
- Final 4 OK Line : Electrical Monorail System
- Window Glass Transfer Line
- Inspection & Water Test Line : Wide Single Slat Conveyor
Beijing Hyundai Motor
8.2 mil $
Sep.2006 ~ Mar. 2005
L90 Assembly Line
(IRAN)
- Production Capacity : 30 UPH
- Trim Line O.H.C. Power & Free (6 inch)
- Drop Lifter (chain) with Synchronized Side Lifter