Project Description |
Equipment Detail |
Customer |
Amount ($) |
Delivery |
DYK#31
Suspension &
Tire Line
Modification |
- Stopper Relocation & Program modification |
DYKMC
(China) |
0.32 mil $
|
Jan.2016 ~
Apr.2016 |
HMC JUNJOO
(KOREA) |
- PAINT SHOP (SLAT CON¡¯V) |
HMC JUNJOO
(KOREA) |
807.5 mil $ |
Sep.2016 ~
Nov.2016 |
HMC Ulsan
#11 Ass¡¯y
Sub-Line
Replacement
(Ulsan, Korea)
|
- Seat supply Line
- FEM supply Line
- C/PAD supply Line |
HMC
(Ulsan) |
3.5 mil $ |
Sep.2016 ~
Jan.201 |
Paint Shop
S1 Line
Conveyor System PLC Control System Replacement
|
- All control Panel replacement
in PT-ED Conveyor system
|
KIA
(Sohari) |
4.4 mil $ |
Feb.2015 ~
Oct. 2015 |
DYK 3-2 TCF SHOP
Suspension
Wire
Tire
Seat |
- Production Capacity: 40 JPH |
DYKMC
(China) |
5.2 mil $ |
Feb.2015 ~
Dec.2016 |
TCF SHOP
#51 Main Line
Modification
(Ulsan, Korea) |
- Program Modification per Vehicle change
- Friction Drive system replacement
All attachment change (DL, Hanger, etc) |
HMC
(Ulsan) |
0.25 mil $ |
Mar.2015 ~
Oct.2015 |
Paint Shop
S1 Line
Conveyor System PLC Control System Replacement |
- All control Panel replacement
in PT-ED Conveyor system |
KIA
(Sohari)
|
4.4 mil $ |
Feb.2015 ~
Oct. 2015 |
Seat #2 Plant
Empty Pallet Input & Loading Conveyor System
(HMC, Ulsan) |
- Free Flow Conveyor
- Loading & Unloading to Truc
- Empty Pallet return Line |
HMC
(Ulsan) |
0.64 mil $ |
Mar. 2015 ~
Aug. 2015 |
Foam Pad Ripening Line
(Chanzou, DYMOS) |
- Power Only Line : 600 m
- Conveyor speed: 4.5 m/sec
- Tact time : 54 secs
Motor Drive (Simens) |
DYMOS
(Chanzou, China) |
1.2 mil $ |
Sep.2014 ~
Aug. 2015
|
ASSEMBLY
SHOP
CONVEYOR
(Truck Plant,
Jeonju, HMC) |
- Large Size Truck Main Assembly Line
- Slat Conveyor: 200m |
HMC
(Jeonju) Motors |
0.75 mil $
|
Mar. 201 ~
Aug.2015 |